On Tuesday, 18 August 2026 11:19:33 AEST Marghanita da Cruz wrote:
> Perhaps the issue is speculating on stuff which we are ill informed. Maybe we would do better keeping to AI and datacentres..
>From The Conversation on 3rd June:
> How much water do data centres use?
> We can only make a rough estimate on water use due to a lack of clear data. Research shows data centres need about 25ML of water per megawatt of capacity. Australia has about 300 data centres with about 1.3 gigawatts of operating capacity. Using these figures, Australia’s current data centres would use 15,000–35,000ML a year. That would be a fraction of 1% of the water used nationwide – close to a rounding error.
Energy usage is more of an issue, especially when water used to generate fossil-fueled power is taken into account:
> Energy is a bigger concern than water
> At present, data centres use just over 2% of the electricity on the National Electricity Market. This would almost triple to 6% within four years, according to Australian Energy Market Operator forecasts. The Clean Energy Finance Corporation estimates the figure could be 11% within a decade.
>
> Energy use isn’t inherently bad. What matters is whether increasing demand will be met by renewables – or gas.
>
> We need better data – on data centres
> We can’t manage what we don’t measure. Data centres are a textbook example of a data gap impeding good policy.
So data centres are part of the big environmental picture too, which is why we need to manage the whole problem as a whole, not in piecemeal fashion as now.
Here in the Southern Highlands, Cloud Carrier is planning a huge gas-fired data centre a short distance from the historic old town of Berrima. From the ABC at
https://www.abc.net.au/news/2026-03-04/gas-plant-ai-data-centre-moss-vale/106405944
> A small town in the NSW Southern Highlands is watching the AI revolution take shape in its backyard, as plans emerge to build one of the state's largest gas-fired power stations to run a data-processing complex.
>
> The proposal from Sydney company Cloud Carrier would see three data centres and a 700-megawatt (MW) power station built on a site six kilometres from Moss Vale.
>
> The power plant would be made up of 21 reciprocating engines [i.e. gas-fired diesel], rather than the turbines used in traditional peaking power stations, generating enough energy to run 70,000 homes.
I see no reason why AI data centres should not be forced to provide their own renewable power, then when the sun sets at location "A" they have to fall back to location "B".
_DavidL_