[LINK] FLoods taking out banking infrastructure
Marghanita da Cruz
marghanita at ramin.com.au
Thu Jan 13 19:53:39 AEDT 2011
Brendan wrote:
<snip>
> If it is a failure of a secondary nature then so be it - "no electricity" shouldn't cut it as they should have on site generators, but perhaps a problem with connectivity to/from the site sounds more plausible? A *DR site* which is taken out by the same flood as the primary seems to me a failure in planning.
<snip>
It is more an issue of the scope of a DR Strategy rather
than site. The most effective approach is to have multiple
operational sites - that way, if one goes down the service
is still available but at reduced capacity.
Marghanita
--
Marghanita da Cruz
http://ramin.com.au
Tel: 0414-869202
More information about the Link
mailing list